Borderland mining support services include earthwork, HDPE piping/fusion, underground utility installation, drainage, plant work, and structural concrete. With more than 80 Mine Safety and Health Administration-trained employees, we are on call to help at a moment’s notice.

7F-Wash

Learn more

Mission Mine Tailings #4

Learn more

Other Notable Projects

  • ASARCO Tour Parking Lot
  • Belgravia Tailings Area
  • Mission Mine Slurry Removal
  • Morenci-FMI Striping
  • Silver Bell Mine

The pump station and transmission pipeline project included earthwork, grading, paving, storm drain, rip-rap, fencing/gates, 84” diameter x 10’ deep drop structure, vaults, pads, vertical turbine pumps, hydro gates, trash screens, conduits, wiring, breakers, disconnects, lighting, enclosures, flow meters, pressure indicators, and instrumentation.

Features

  • 172,530 CY of Earthwork/Grading
  • 10,850 LF of 24″ HDPE Pipe Line
  • 7500 LF of 18″ HDPE Pipe Line
  • 3600 LF of DC HDPE Pipe Line
  • 570 LF of 18″ CMP
  • 1065 LF of 24″ CMP
  • 570 LF of 24″ Arched SRP (28″x20″)
  • 705 LF of 42″ CMP
  • 20,825 LF of 24″ HDPE SDR-17 Pipe
  • 7460 LF of 18″ HDPE SDR-17 Pipe
  • 3572 LF Dual Contained 18″ SDR-17 Carrier x 24″ SDR-32 Containment
  • 375 LF of 24″ SRP Sleeving
  • 740 LF of 36″ SRP Sleeving