Mining Support
Borderland mining support services include earthwork, HDPE piping/fusion, underground utility installation, drainage, plant work, and structural concrete. With more than 80 Mine Safety and Health Administration-trained employees, we are on call to help at a moment’s notice.
Other Notable Projects
- ASARCO Tour Parking Lot
- Belgravia Tailings Area
- Mission Mine Slurry Removal
- Morenci-FMI Striping
- Silver Bell Mine
The pump station and transmission pipeline project included earthwork, grading, paving, storm drain, rip-rap, fencing/gates, 84” diameter x 10’ deep drop structure, vaults, pads, vertical turbine pumps, hydro gates, trash screens, conduits, wiring, breakers, disconnects, lighting, enclosures, flow meters, pressure indicators, and instrumentation.
Features
- 172,530 CY of Earthwork/Grading
- 10,850 LF of 24″ HDPE Pipe Line
- 7500 LF of 18″ HDPE Pipe Line
- 3600 LF of DC HDPE Pipe Line
- 570 LF of 18″ CMP
- 1065 LF of 24″ CMP
- 570 LF of 24″ Arched SRP (28″x20″)
- 705 LF of 42″ CMP
- 20,825 LF of 24″ HDPE SDR-17 Pipe
- 7460 LF of 18″ HDPE SDR-17 Pipe
- 3572 LF Dual Contained 18″ SDR-17 Carrier x 24″ SDR-32 Containment
- 375 LF of 24″ SRP Sleeving
- 740 LF of 36″ SRP Sleeving